Jump to content

HDB Electrical shut down 9am-5pm


Recommended Posts

  • SRC Member

Normally they will not shut down from 9am to 5pm. What it really means is that power will be shut down anytime in between the hours of 9am to 5pm. As usual when you call your branch office, no one can confirm the duration of the outage.

I stay in the Bukit Merah area and have expereinced power shut downs for less than an hour when they said the shutdown is from 9am to 5pm. But your scenerio may not be the same as mine and it is better for you to prepare for the worst.

The best way is to rent a portable power generator from the shops along Jalan Besar, I rented one many years ago for 20$ a day. :lol:

Link to comment
Share on other sites

I experienced that twice when HDB upgrade the entire block's electrical system.

Power was off at 9am SHARP and only returned at 5pm.

You can try to ask the contract to pull a temporary power line into your house. Just use it for your tank equipment only. Don't connect any other electrical equipment (tv, fridge, etc) to it as it may not have sufficient power. Only catch is that you must have somebody at home.

Otherwise use a battery operated air pump to aerate you tank. The corals should still be ok for 1 day without water circulation or skimming. And no feeding until power resumes.

Good luck.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share



×
×
  • Create New...