so... there has been 2~3weeks long delay due to having no time to collect the tanks.
today the tank arrived ,
here's the tank, sump, completed stand and finally bought all the required pvc pipes (short of 2 elbows) to setup all the piping and diy the durso pipe. also diy-ed the overflow teeth.
drain line will enter sump from the left , and return straight up to the tank from the right.
i am going real slow
http://i1297.photobucket.com/albums/ag36/youdontknowme00/20130806_180841_zps66de49ea.jpg
http://i1297.photobucket.com/albums/ag36/youdontknowme00/20130806_175133_zps5832c043.jpg
http://i1297.photobucket.com/albums/ag36/youdontknowme00/20130806_175039_zps54971928.jpg
http://i1297.photobucket.com/albums/ag36/youdontknowme00/20130806_175022_zps2357273b.jpg